By Air Or By Sea.
TT, L/C.
7 days for mould design, 60 days for mould delivery calculated from the deposit to the first mould trial.
1.Sample or design or sample photo with size.
2.Mould cavity request.
3.Runner type, coldrunner or hotrunner.
4.Mould steel ,P20, 718, 2738,H13,S136,2316,an so on.
5.Injection machine parameter or plate size(tie bar distance).